Day 15 - Wednesday, August 22, 2018


Here is our Design/Shape/Grow-in Team (Right - Left) Kyle Kramer, Jim Urbina, Jack Robbins & Steve Sarro




Buggies are used to move concrete into areas where the big concrete trucks can not access.




More work on shaping the range tee. Space is limited, but to achieve the new tee, the top tee lowers 4 feet and the bottom tee comes up 1 foot. The tee will be all one level to maximize teeing grounds.




Luis is pictured here checking depths of greens mix. There should be 12" of mix consistently throughout the green. This is why the floor of the green needs to match up with the surface to allow for proper rootzone space for the new turf.








The crew is buttoning up some of the drain access points around the green as the mini excavator starts to grade out the new cart path around the green.

Comments